Interactive 3D Engineering Digital Twin • TEMA Type BEU Exchanger
Explore mathematically verified ASME Section VIII Div 1 & TEMA Class R U-Tube heat exchanger pressure vessel and bundle mechanics.
Real-Time Manufacturing Lifecycle • 8 Quality Milestones
Every heat exchanger manufactured by PAL ENGINEERS adheres strictly to our traceable quality management framework.
Thermal & Mechanical Design
Thermal simulation via HTRI Xchanger Suite and mechanical calculation per ASME Section VIII Div 1 & TEMA Class R.
- HTRI Thermal Rating Approval
- ASME Thickness Calculations
- GA & Fabrication Drawings Signed
Raw Material Procurement & NDT
Receipt of certified boiler quality plates (SA 516 Gr 70) and seamless heat exchanger tubes (SA 213 TP316L / SA 179) with EN 10204 3.1 MTRs.
- Ultrasonic Testing (UT) on Plates
- Positive Material Identification (PMI)
- 100% Dimensional Verification
CNC Tubesheet Drilling & Grooving
High-precision multi-spindle CNC drilling of tube holes with serrated grooves per TEMA Class R standards for maximum tube joint integrity.
- Tube Hole Tolerance (+0.05 mm)
- Double Serration Groove Profile Check
- Tubesheet Ligament Clearance Audit
Tube Bundle Skeleton & Baffle Assembly
Assembly of segment-cut transverse baffles, tie rods, and spacer tubes ensuring precise baffle pitch and fluid cross-flow distribution.
- Baffle Chamfering & Deburring
- Tie Rod Torque & Locking Checks
- Tube-to-Baffle Diametral Clearance
Tube Insertion & Torque-Controlled Expansion
Precision insertion of U-tubes followed by computer-controlled electronic torque expansion and seal welding per ASME Section IX WPS/PQR.
- Wall Thinning Verification (< 5%)
- GTAW Orbit Seal Welding (Tube-to-Tubesheet)
- Liquid Penetrant (DPT) on Tube Welds
Pressure Vessel Shell Fabrication & RT
Heavy plate rolling, SAW long seam and circ seam welding, nozzle fit-up, and 100% Radiographic Testing (RT) per ASME Section VIII Div 1 UW-51.
- 100% Radiography on Long & Circ Seams
- Nozzle Flange Alignment & Orientation
- 2:1 ASME Ellipsoidal Dished Head Fit-up
Hydrostatic Pressure Testing (1.5x Design)
Shell side and tube side independent hydrostatic pressure test holding at 1.5x design pressure for 1 hour with calibrated pressure gauges.
- Shell Side Hydro Test (Zero Pressure Drop)
- Tube Side Hydro Test (Zero Tube Joint Leakage)
- Client / Third-Party Inspector Witnessing
Sandblasting, Painting, Preservation & Dispatch
Surface preparation to SA 2.5, high-build epoxy primer and polyurethane coating, nitrogen purging, wooden crating, and logistics release.
- Surface Profile SA 2.5 & DFT Audit
- Final Manufacturing Data Record (MDR) Dossier
- Dispatch Clearance & Transit Tracking
Visit Our Anand Industrial Estate Manufacturing Facility
Industrial clients and third-party inspection agencies (TUV, Lloyd's, BV, Engineers India Ltd) are always welcome to conduct in-person stage-wise inspection at our works in Mohan Nagar, Ghaziabad.